Project: Upgrading Thuong Dong pumping station, Vinh Bao district, Hai Phong city
Detailed description: Supply, transport and installation of 10 pump units HTĐ8000-4 with engine 170Kw-490v / p, 10 control cabinets, 02 central control panels and electrical equipment. Pump station with scale of 10 units, total capacity of 80,000 m3 / h. Thuong Dong pumping station is one of five main drainage pumping stations for the whole city and is the only drainage pump station for both Tien Lang and Vinh Bao irrigation systems.